Yakab Company, located in the Science and Technology Park of Sharif University of Technology

Iran

 

Employer: Mr. Azzavabadian

Project Location: Razi Village, Damghan

Description: Well video inspection, well casing repair, well yield restoration, and sediment removal along with pumping test.

This well was drilled about twelve years ago. The initial flow rate of the well was 17 liters per second. Over time, sedimentation and migration of fine particles caused a reduction in the well’s yield, which dropped to 8 liters per second. Additionally, one section of the well casing had experienced deformation and physical damage. Through well video inspection, the condition of the well was assessed, and then casing restoration and yield restoration were carried out using Nitropulse technology. At the end of the process, approximately 8 meters of the well had been filled with sediments. By using pumping, the well was extended, and the sediments were removed. After the pumping operation, the well’s yield increased to 18 liters per second.

Iran