Employer: Mr.Moghadam
place of operation: Varamin, Javadabad village
Description: The Tepe Ata well, which was dug 5 years ago, suffered from reduced water supply due to sanding sand entering the well and damage to the pump as well as deformation in the wall pipe. Every year the employer had to replace the pump dredging the well and other side costs. By carrying out the well rehabilitation operation the amount of sanding of the well was reduced to some extent and part of the employer’s costs were reduced.